Battery selection for industrial backup & UPS
Start with the UPS model, backed-up load, required outage runtime and recovery time. Check the proposed battery against DC cutoff, charger and rack constraints.
Prepare a project briefWhat to specify
| Decision | Inputs to record | How to check |
|---|---|---|
| Load and duration | Backed-up AC kW or battery-side DC kW/A, required minutes and repeat outage profile. | Check battery terminal voltage and available energy at the actual discharge power and cutoff. |
| Recharge window | UPS charger voltage range, available DC current and time until the next required backup event. | Check recovery under representative conditions including temperature derating and concurrent load. |
| Integration | BMS interfaces, protection coordination, rack envelope, ventilation and service access. | Confirm disconnect behavior and acceptance checks on the installed system. |
Cell references for initial screening
Use these source values for an initial comparison. Pack voltage, current capability, physical fit and test evidence depend on the proposed build.
Sample acceptance
Record runtime, terminal voltage and temperature at agreed load and ambient conditions. Confirm recovery after a representative outage. Review evidence for the exact rack or pack before procurement.
IEC 62619:2022 scope for industrial secondary lithium batteries · Review the evidence checklist