JLiBATTERY

Battery selection for AGVs & mobile robots

Use shift logs, dock charging time, motor peaks and the controller interface to evaluate a replacement battery or specify a custom pack.

Prepare a project brief

What to specify

Project requirements
DecisionInputs to recordHow to check
Shift and chargingLoad across the shift, usable runtime, idle periods, dock dwell time and charger output.Log time and energy on a representative route. Include payload, cold operation, reserve and aging.
Motor peaks and fitContinuous current, startup peak and duration, regen current, voltage cutoff, envelope and mounting.Check terminal voltage during repeated starts and under maximum payload. Confirm connector, cable exit and service space.
Controller and dockCharger and controller model, pinout, CAN or RS485 message mapping where applicable.Verify charge enable, state-of-charge reporting, faults and recovery on the proposed sample.

Download project worksheet (CSV)

Cell references for initial screening

Use these source values for an initial comparison. Pack voltage, current capability, physical fit and test evidence depend on the proposed build.

Dated cell references
ModelCell routeNominal cell valuesSource edition
LTO40LTO · Cylindrical2.3 V / 40 Ah2026
LFP100LFP · Prismatic3.2 V / 100 Ah2026

Sample acceptance

Agree the loaded route, payload, usable shift runtime, recharge target and data capture before approving a sample. Log voltage, current and temperature. Review the transport and end-use documentation for the actual pack.

IEC 62619:2022 scope for industrial secondary lithium batteries · Review the evidence checklist